Comprehensive Renovation of Hallways and Rooms on the Ground Floor of the Presidential Building

28 March 2025

 

As part of the ongoing development projects supervised by the Construction and Projects Department, a comprehensive renovation of the hallways and rooms on the ground floor of the Presidential Building has been completed. This project aims to enhance the functional environment and provide a modern, comfortable workspace that meets the needs of the administrative staff.

 

Work Details:

  • Renovation of flooring using high-quality materials to ensure durability and aesthetic appeal.
  • Painting and finishing of walls and ceilings according to the latest engineering standards.
  • Upgrading the lighting system and electrical installations to improve efficiency and energy savings.
  • Maintenance of doors and windows to ensure optimal functionality.
  • Enhancing the ventilation and air conditioning system to provide a comfortable work environment.
  • Close supervision by the engineers of the Construction and Projects Department to ensure that all work meets the required specifications and is completed within the set timelines.

This project is part of a series of development initiatives aimed at improving the infrastructure efficiency of the University of Technology, ultimately enhancing administrative performance and creating an optimal work environment.

 

We have 50 guests and no members online

136836
TodayToday42
YesterdayYesterday231
This_WeekThis_Week1397
This_MonthThis_Month5344
All_DaysAll_Days136836
Highest Visitors 10-24-2024 : 757

                                               website designer

Top